Precision CNC Micro-Machining for Miniature and Micro-System Components

Still deciding? Get samples of $ !
Order Sample

Product Description

Precision CNC Micro-Machining
Basic Info & Delivery
Surface Treatment
Hard Anodizing
Production Type
Mass Production
Machining Method
CNC Machining
Material
Steel, Plastic, Brass, Alloy, Copper, Aluminum, Iron
Package Size
5.00cm * 5.00cm * 10.00cm
Gross Weight
0.050kg
Capacity
50000 Pieces/Year
Lead Time
1-4 Weeks
Product Description
Available material Metal: stainless steel, aluminum, steel, titanium, brass, etc.
Plastic: POM, ABS, PVC, PP, PA, PE, PMMA, Rubber
Manufacturing process CNC machining, CNC milling, CNC turning
Tolerance +/-0.002 ~ +/-0.005mm
Surface Roughness Min Ra0.1 ~ 3.2
Drawing Accepted STP, STEP, LGS, XT, AutoCAD(DXF,DWG), PDF, or Samples
Quality Assurance ISO 9001:2015, SGS, RoHs
CNC Machining Display
Product Advantages
1. Fast Response
RFQ feedback within 24 hours; delivery as fast as 10 days.
2. High Precision
Tolerances meet ISO 2768 standards with tighter options.
3. Wide Material Choice
Over 30 metal and plastic materials available.
4. Custom Finishes
Multiple surface treatment options for all parts.
5. Experienced Team
15+ years in manufacturing with expert DFM feedback.
6. Strict QC
Full inspection from material to final product.
Technical Showcase
FAQ
Q1: Do you have quality management certifications?
Yes, we are ISO 9001: 2015 certified to ensure the highest standards of production.
Q2: Do you offer design services for machined parts?
We have design capabilities, but customers must approve the final design. Please provide CAD models and specifications for evaluation.
Q3: What is the cost and lead time for samples?
Sample lead time is usually 1-2 weeks. Costs vary by complexity and may be refundable upon production orders.
Q4: What manufacturing equipment is available in your facility?
Our facility includes 26 CNC Machining Centers, 18 CNC Turning Machines, and 8 Automatic Lathes.
Q5: How long does it take to receive a quote?
We generally provide a competitive quote within 24 hours, and no longer than 48 hours for complex projects.
Q6: What are your typical production and shipping lead times?
Production takes 1-4 weeks depending on complexity. Shipping takes 3-7 days via air-express or 15-30 days via ocean.

Related Products